Just come back from a trip to Home Depot. I used the truck hire, which was easy. Now I also have 3 sheets of 4’x8′ 3/4″ oak ply in my basement, and I picked up a few 2″x3″x8′ studs too for cutting supports.
Related Posts
Building a MAME cabinet 18
Bit of a slow week – the family was here for Thanksgiving, and I didn’t work much on the cab. Here are some pictures from last weekend. The woodwork is all but done now, and my next task is to wire the control panel. This is actually non-trivial, and I…
Building a MAME cabinet 11
Another weekend, another bit of work on the old cabinet. It’s starting to come together now. I popped over to Home Depot to pick up another ply blade for the saw, a couple of jigsaw blades to replace the one I’d snapped, and some 1″x2″ oak for ledger boards. At…
Building a MAME cabinet 14
I have three things left to do before I start assembly: Fit ledgers for the monitor shelf Fit the keyboard tray runners Stain and varnish the sides Although I ordered the monitor last Saturday, it hasn’t arrived yet. I’ll probably get it early next week. So for the moment I’m…